Crow Holdings Industrial, Azusa, CA, November 2, 2018 – The roof structure is installed and roofing is underway.  Scaffolding on the South and East sides of the building are in process for installation of parapet treatment.  Underground detention is installed.

Crow Holdings Industrial
Vincent Commerce Center
Project Update
October 12, 2018
Panelized roof structure segments being installed.  Preparing for skylight and roofing installation. Grading around the truck docks and main entry stairs in progress.

 

Crow Holdings Industrial
Vincent Commerce Center
Project Update
October 5, 2018
Roof structure is being installed, concrete walls are getting sacked and patched in preparation for paint and glazing.

 

Crow Holdings Industrial
Vincent Commerce Center
Project Update
September 29, 2018
Exterior walls have been tilted, crane still on site.

 

Crow Holdings Industrial
Vincent Commerce Center
Project Update
September 10, 2018
Panels are poured and ready to be tilted.

 

VINCENT COMMERCE CENTER
Azusa, CA
A 148,000 SF state-of-the-art industrial building with 143,000 SF on the ground floor and a 5,000 SF mezzanine. 175 parking stalls are provided along with a 32’ clear height, 17 dock high doors and a large truck court. The project has convenient access to Interstate 210, 605 and 10 freeways.

Owner: Crow Holdings Industrial
General Contractor: Fullmer Construction